Bathroom Remodeling in Wayne, PA

Custom bathrooms for Wayne’s stone colonials and Main Line homes — designed and built by one team, on a fixed price, since 1989.

Google 4.8 stars - 186+ Reviews
PA Licensed and Insured - HIC PA202519
Established 1989 - 35+ Years in Business

Last updated: May 2026 · Alex Smearman, Fedor Fabrication

Most bathroom remodels go wrong the same way

It’s almost always one of these three:

  • The estimate that creeps the moment the walls come open.
  • The crew that vanishes for two weeks at a stretch.
  • The finger-pointing when the designer and the plumber stop talking.

The fear of landing there is the real reason a lot of dated bathrooms stay dated for years — and it’s a reasonable one. It’s the thing we built this company to put to rest.

A Wayne stone colonial primary bath is one of the most complex projects we run — the originals are often just 50–75 square feet and almost always have to expand into adjacent space, on top of full replumbing, subfloor reinforcement, and plaster restoration in the room below. So before you commit, you want straight answers — what it really costs, how long it really takes, and what it’s like to live through. That’s what the rest of this page is for.

We’ve rebuilt Wayne bathrooms since 1989 on fixed-price contracts, with one point of contact who answers your calls — so the number is real before you sign, and you’re never the one chasing us.

What a Wayne stone colonial primary bath actually involves

Marble wainscot and window detail in a Wayne primary bathroom by Fedor Fabrication

Most Wayne bath work is one of three jobs:

Pre-1930 primary baths — the common one. Originally 50–75 sq ft; almost always expanded. Typical scope:

  • Expand into an adjacent closet, bedroom, or hall
  • Frameless walk-in shower, tile to the ceiling
  • Freestanding soaker tub, if space allows
  • Double vanity
  • Replace cast-iron drains and galvanized supply
  • Reinforce the subfloor; address the radiator

Secondary & hall baths — 40–55 sq ft, tighter scope:

  • Tub-to-shower conversion with frameless glass
  • Reconfigure for real linen storage
  • Replumb supply and drain
  • Modern lighting and ventilation

Mid-century & newer baths — less common in central Wayne; standard scope.

Freestanding soaker tub in a Wayne primary bathroom by Fedor Fabrication

The same crew, start to finish

The people in your home are our own carpenters — not subcontracted labor that shows up one day and disappears the next. It’s why the work holds up, and why homeowners keep telling us our crews are the most respectful, communicative people they’ve had in their house.

Wayne bathroom costs — why Radnor Township primary baths skew higher

Bids for a project like this land all over the map — and the lowest one is usually the one that climbs the most once the walls come down. We’d rather hand you the honest range up front.

TierRangeTypical Wayne project
Bath Refresh$25,000 – $40,000Powder room or basic refresh
Full Bath Remodel$35,000 – $65,000Stone colonial hall bath with tub-to-shower conversion
Primary / Master Bath$50,000 – $90,000+Stone colonial primary suite with full replumbing and footprint expansion

Two dials set the price: scope and finish — and they move independently. Scope is how much work and how big the project is — a bath refresh updates surfaces and fixtures in place; a full bath remodel rebuilds within the room, often converting a tub to a walk-in shower; a primary suite is the biggest by nature, expanding the footprint and replumbing. Some of that is locked in — a primary bath is always the largest room — but finish is the separate dial: a refresh can still get Brizo or Waterworks fixtures, while a full primary suite can stay measured with Delta fixtures and a Tribeca vanity. Every shower, at any tier, is built on a fully-bonded Schluter KERDI, Wedi, or RedGard system. We’ll install whatever you spec — the brands below are simply the lines we reach for most.

Wayne stone colonial bathrooms typically land in the upper end of the published ranges because of the replumbing, subfloor work, and structural realities of expanding into adjacent space. The Primary Bath tier doesn’t carry a hard ceiling — fully custom primary suites with millwork integration, premium fixtures, and footprint expansion regularly exceed $90K.

Aging-in-place additions are increasingly common in Wayne primary baths — curbless showers, integrated grab bars, comfort-height fixtures. Adds $3K–$8K.

Free Download

Want the full line-item breakdown?

The 2026 Southeastern PA Bathroom Cost Guide breaks down every tier — from a $25K refresh to a $90K+ primary suite — with line-item costs from completed Fedor projects across Chester County, Delaware County, and the Main Line.

Free PDF · No spam · Unsubscribe anytime

Selections

The vanities, fixtures, and waterproofing we install

We build from lines that hold up in a wet room — not whatever’s on promotion. Here’s what we typically spec, and we don’t take supplier kickbacks on any of it:

  • Vanities & cabinetry: Tribeca, Aspect, Century, Shiloh, Eclipse, and Great Northern — accessible to fully custom, plywood boxes, soft-close
  • Countertops: Cambria, Caesarstone, Silestone, and Emerston quartz; marble and quartzite slabs from Imperial Marble & Granite
  • Plumbing fixtures: Kohler, Delta, Brizo, Hansgrohe, Rohl, and Waterworks — specified through Ferguson and Weinstein Supply
  • Waterproofing: every shower on a fully-bonded system — Schluter KERDI, Wedi, or RedGard — with DITRA-HEAT under heated tile floors

Our Design-Build Process

Expanded Wayne primary bathroom with frameless walk-in tile shower by Fedor Fabrication

Most remodels go sideways for the same reason: design and construction don’t talk to each other. The designer draws something the builder can’t actually build for the price quoted, and you’re stuck in the middle.

We use a design-build model — the team that designs your Wayne bath is the team that builds it. By the time you get a contract, every line is priced, every spec is confirmed, and the old-house problems other remodelers hit mid-job (cast-iron drains, knob-and-tube, an out-of-level subfloor) are already solved.

The 8 steps, start to finish

  1. First Call — 15 minutes with Alex, the owner, to hear what you’re planning.
  2. In-Home Consultation — we walk the space and listen.
  3. Design + Initial Estimate — a concept and a real budget range.
  4. Selections & Refinement — every finish chosen before we build.
  5. Fixed-Price Proposal — every line priced; the number is real before you sign.
  6. Pre-Construction — permits, ordering, scheduling, staging.
  7. Construction — carpenter-led crews, one point of contact, weekly updates.
  8. Walkthrough + Warranty — closeout, backed by a 1-year workmanship warranty.

On schedule — and you’re never chasing us

“Nobody showed up for two weeks” doesn’t happen here. We block dedicated crew time and hold to it, with one point of contact who answers your calls and a live portal showing exactly where your project stands.

Frameless walk-in tile shower in an expanded Wayne primary bathroom by Fedor Fabrication

Radnor Township permitting for Wayne bathroom work

We handle all of it — every required permit, pulled through Radnor Township. Permit fees tend to run 1–2% of contract value and are included transparently on every Fedor proposal.

Where we source for high-finish Wayne baths

Recent Work

Recent Wayne Projects

Frameless walk-in tile shower in an expanded primary bathroom in Wayne, PA — bathroom remodel by Fedor Fabrication

Primary Bath & Walk-In Shower

Footprint expansion with a frameless walk-in tile shower.

Large-format porcelain master bathroom with marble soaking tub in Wayne, PA — bathroom remodel by Fedor Fabrication

Porcelain Master Bathroom

Large-format porcelain primary suite remodel.

What Wayne Homeowners Say About Working With Us

★★★★★ 4.8 / 5

186+ verified reviews across Google and Angi

Reading reviews is the single best way to know what working with a contractor is actually like. We’d rather you read what our Main Line clients say in their own words than read marketing copy from us.

We used Fedor Fabrication to remodel our hall bathroom. They did a wonderful job. We were impressed by their design specialist who listened to our ideas and helped make them work within our budget. Their workers were great — always polite, efficient and very tidy. A friend recommended Fedor and we are so glad we had them do this job — we highly recommend them.

Harry U. — verified Google review

They were punctual, professional, courteous, friendly, and communicative. Our renovations were completed timely and on budget.

Homeowner, West Chester — verified review

Frequently Asked Questions

How much does a bathroom remodel cost in Wayne?

Wayne bathroom remodels run $25,000 to $90,000+ depending on scope. A hall-bath refresh starts around $25K–$40K; a full stone colonial hall bath with a tub-to-shower conversion runs $35K–$65K; a primary suite with full replumbing, footprint expansion, frameless shower, and freestanding tub runs $50K–$90K+, and fully custom suites go beyond that. Wayne projects tend to land at the upper end of each tier because the replumbing and structural work pre-1930 stone colonials need adds real cost. The free cost guide above breaks every tier down line by line.

How long does a Wayne stone colonial primary bath remodel take?

Most Wayne primary-bath remodels run 5–7 weeks of active construction once tile and fixtures are on site. The full timeline from first call to final walkthrough is typically 2.5–4 months, because a pre-1930 stone colonial adds steps a newer home doesn’t — selective demo around plaster, replumbing, subfloor leveling, and Radnor Township inspections between phases. We give you a hard date at proposal and update it weekly in the JobTread portal so you’re never guessing where the project stands.

What’s included in your fixed-price quote?

Everything we can see at signing: design, all materials (tile, vanity, fixtures, hardware), all labor and trade partners (plumbing through our plumber, electrical through our electrician, tile, finish carpentry), permits, inspections, dumpster, project management, and the final walkthrough. The known old-house work — replumbing, subfloor reinforcement, plaster ceiling repair — is priced in, not left as an allowance that balloons mid-project. The only thing that changes the number is scope you choose to add after signing, documented and approved by you in writing first.

What happens when you open a wall in a 1920s Wayne home?

In a pre-1930 Wayne stone colonial we almost always find something — corroded cast-iron waste lines, galvanized supply, knob-and-tube wiring, an out-of-level or under-built subfloor, or old water damage under the tub. None of it surprises us; it’s why these projects take real expertise to run. We document whatever we find, photograph it, price the fix, and get your written approval before proceeding. No silent change orders.

Can you expand my primary bath into an adjacent closet or bedroom?

Yes — it’s the single most common Wayne primary-bath ask. Original stone colonial primary baths run 50–75 sq ft, which won’t fit a double vanity, walk-in shower, and freestanding tub. Absorbing an adjacent closet, small bedroom, or hall section is usually feasible; we bring in a Pennsylvania-registered structural engineer when a load path is involved. Adding 30–80 sq ft typically adds $15K–$35K depending on whether we’re moving a load-bearing wall and relocating plumbing.

Should I keep the old jetted tub, or convert to a walk-in shower?

Honestly, most Wayne homeowners convert. The jetted tubs installed in 80s and 90s renovations rarely get used, the motors fail, and they eat space a frameless walk-in shower would use far better. If you genuinely take baths, we’ll design in a freestanding soaker instead — better than a jetted tub and much easier to clean. If you don’t, converting almost always improves daily use and resale. We give you our honest read for your specific room, not a default upsell.

Do you have to replace the cast-iron drains?

Often, yes. On pre-1930 Wayne homes the original cast-iron waste lines and galvanized supply are usually partially corroded — restricted flow and the occasional pinhole leak. If we’re already opening the floor for a footprint change or a freestanding tub, replacing them while access is open is far cheaper than coming back later. On a typical primary-bath replumb, budget $3K–$6K. We scope and price it before signing — never as a surprise change order.

Will the remodel damage the plaster ceiling in the room below?

Plan on some plaster ceiling restoration below — it’s nearly unavoidable when you replumb a second-floor Wayne bath. We include it in scope from the start rather than treating it as a surprise. Where the ceiling is historic or has decorative plaster, we restore it properly rather than just drywalling over it, and we tell you up front which approach your specific room calls for and what it costs.

Can you do aging-in-place modifications without it looking institutional?

Yes — and that’s the case for doing it during the remodel instead of bolting it on later. A curbless walk-in shower, blocking in the walls for future grab bars, a comfort-height toilet, and a bench detail all integrate cleanly when planned from the start. Built in at the framing stage it adds roughly $3K–$8K, and done right you’d never read it as “aging-in-place” — it just looks like a well-designed bathroom that happens to work at any age.

What does Radnor Township permitting cost for a Wayne bath project?

Permit fees through Radnor Township typically run 1–2% of contract value. On a $90,000 primary bath, expect roughly $900–$1,800. We pull every required permit, schedule the inspections around the production schedule, and show the permit cost as a transparent line item on the proposal — it’s never buried in markup or sprung on you mid-project.

Do I need to hire my own designer?

No separate designer needed — we’re design-build, so the team that designs your Wayne bath is the team that builds it; nothing gets drawn that we can’t build for the price quoted.

How will you communicate with me during construction?

During construction you get one point of contact (Alex or your project manager) who answers calls and texts, weekly progress updates, and a heads-up before anything becomes a problem, plus the live JobTread portal showing schedule, budget, and invoices. On a 100-year-old house, that communication is the difference between a manageable project and a stressful one.

Do you also do kitchen remodels in Wayne?

Yes — see Wayne kitchen remodeling for stone colonial kitchen scope, Radnor Township permitting, and recent Wayne kitchen projects. See everything we do in Wayne.